Project

VASD interim repair blast furnace

  • voest HO
  • 2013 - 2015
  • Austria
  • Primary Industry

Description

  • Reconstruction blast furnace 1 & 2
  • 2.000 t/d pig iron production
  • 110.000 m3/h hot blast at 1.200 °C
  • Blast furnace gas 130.000 Nm3/h at 130 °C

Services

  • Engineering
    • Electrical
    • Instrumentation & Control
    • Automation
  • Field Service
    • Local Construction Supervision
    • Commissioning

Performances

  • Preparation of control scheme and instrumentation list
  • Assembling the overall documentation
  • Commissioning
    • blast furnace closure
    • central hydraulics and cowper fittings
    • conveyor
  • Preparing and reviewing of the as built documents