Description
- Reconstruction blast furnace 1 & 2
- 2.000 t/d pig iron production
- 110.000 m3/h hot blast at 1.200 °C
- Blast furnace gas 130.000 Nm3/h at 130 °C
Services
-
Engineering
- Electrical
- Instrumentation & Control
- Automation
-
Field Service
- Local Construction Supervision
- Commissioning
Performances
- Preparation of control scheme and instrumentation list
- Assembling the overall documentation
- Commissioning
- blast furnace closure
- central hydraulics and cowper fittings
- conveyor
- Preparing and reviewing of the as built documents