Project

Combined heat and power plant south GuD 2 MUC

  • SWM - Stadtwerke München
  • 2002 - 2005
  • Germany
  • Power Engineering

Description

  • Construction of combined heat and power plant south
  • 2 x gas turbine gas/ oil fired each 117 MWel
  • 2 x two pressure HRSG each 116 bar / 310 t/h + 8 bar / 28 t/h
  • 2 x supplemental firing each 100 MWth
  • 1 x steam turbine with 140 MWel
  • 6 x steam pressure reducing stations
  • 5 x District heating lines with overall 6.500 t/h / 500 MWth

Services

  • Engineering
    • Electrical
    • Instrumentation & Control
    • Process
  • Technical Documentation
    • Manuals & Instructions
  • Field Service
    • Local Construction Supervision
    • Commissioning

Performances

  • Detail engineering of
    • Water and steam cycle
    • HRSG including
      • Supplemental firing
      • District heating system
  • Overall control strategy incl. process-specific support
  • Function charts acc. to VGB-R 170c
  • Supervision
  • Commissioning