Project
Combined heat and power plant south GuD 2 MUC
- SWM - Stadtwerke München
- 2002 - 2005
- Germany
- Power Engineering
Description
- Construction of combined heat and power plant south
- 2 x gas turbine gas/ oil fired each 117 MWel
- 2 x two pressure HRSG each 116 bar / 310 t/h + 8 bar / 28 t/h
- 2 x supplemental firing each 100 MWth
- 1 x steam turbine with 140 MWel
- 6 x steam pressure reducing stations
- 5 x District heating lines with overall 6.500 t/h / 500 MWth
Services
-
Engineering
- Electrical
- Instrumentation & Control
- Process
-
Technical Documentation
- Manuals & Instructions
-
Field Service
- Local Construction Supervision
- Commissioning
Performances
- Detail engineering of
- Water and steam cycle
- HRSG including
- Supplemental firing
- District heating system
- Overall control strategy incl. process-specific support
- Function charts acc. to VGB-R 170c
- Supervision
- Commissioning